Floorplanning Decides the Tapeout
Every tapeout war story I've heard starts long before the final signoff crunch. It starts at floorplanning. Get the floorplan right and the rest of the flow is an optimization problem. Get it wrong and the rest of the flow is damage control.
The floorplan is where you spend your cheapest effort on your most expensive decisions. Moving a macro in week two costs an afternoon. Moving it in week ten costs your schedule.
Macro placement is the first big call. Hard macros — memories, analog blocks, PHYs — are the boulders in the stream; everything else flows around them. Place them with the dataflow in mind: keep producer and consumer blocks adjacent, keep the critical paths short and straight. A macro parked on the wrong side of the die doesn't just add wirelength — it adds it exactly where your timing budget is thinnest.
Then there's channel budgeting. The space between macros isn't leftover area; it's your routing resource. Starve the channels and congestion builds up exactly where you can least afford detours. Be generous early. You can always give area back, but you can't conjure routing tracks out of a congested channel late in the game.
Pin assignment is the quiet killer. Pins placed without thinking about the board and the package become long, meandering routes that cross the entire die. Coordinate with the package team early. A pinout that respects both the die floorplan and the package substrate saves everyone pain.
Power planning rides along with floorplanning, not after it. Your PDN straps need a plan before placement, because a power grid retrofitted around placed macros is a compromise. Think about where the current hotspots will be and make sure the grid is dense there.
The most underrated floorplan activity is the review. Put it on the big screen and walk through it with fresh eyes. Ask: where will congestion hurt? Where are the long paths? What happens when this block grows 10%? A floorplan that only works if everything stays exactly as estimated isn't a plan — it's a wish.
None of this is glamorous. But ask any engineer who's lived through a painful tapeout where it went wrong, and the answer is almost always the same: the floorplan.
Spend the time early. Your future self, staring at a congestion map at 2 AM, will thank you.